Title obras

How to get building permits in Barcelona (2026 Guide)

If you are planning a full renovation or a partial one, correctly processing your building license in Barcelona is the first step to avoid fines of up to €3,000 and work stoppages. In this guide, we explain the types of permits according to the Barcelona City Council.

In this article, we are going to explain how to obtain the ‘Assabentat d´obres’ in Barcelona.

1. Building Activity Notification (ASSU)

For most renovations in Barcelona that do not affect the structure or protected elements, the ASSU (Assabentat d´obres) is used.

It is a free and immediate process for:

  • Bathroom and kitchen renovations.
  • Changing flooring, painting, and interior woodwork.
  • Renewal of electrical or plumbing installations.

2. How to process the ‘Assabentat’ online: Step by step

To obtain the permit immediately, access the City Council’s Electronic Office. It is a free process, no architect is needed and it can be requested via Internet, simply with your personal details and the property’s cadastral reference number. Follow these steps:

  1. Identification: Enter the City Council’s E-Office. Describe the type of work (bathroom renovation, parquet installation, etc.) and under the type of activity select “works” (obras).
  2. Location: Enter the address and the Cadastral Reference (Referencia Catastral). The system will check if the building has heritage protection.
  3. Work Details: Select “Guided Questions” (Preguntas Guiadas), then “intervention inside a building”, “works inside a home”, and “Without affecting distribution or structure” (This process only allows works that do not touch structural elements).
  4. Applicant Details: Fill in your name, surname, ID/NIE, phone number, email, address, and representation (if applicable). After completing all fields, you will obtain the Permit. 
  5. Obtaining: After filling in all the data and clicking continue, you can download the PDF with the case file number. You now have your legal license! You will also receive it by email.
⚠️ Mandatory Notice: You must print the document and post it in a visible place in the building’s entrance (portería) during the works to avoid sanctions from the City Police (Guardia Urbana).

Do you need help with your renovation paperwork?

At Reformas Barcelona we take care of all technical and administrative management so you don’t have to worry about anything.

Get a Free Quote

3. When a change in the flat’s layout is needed:

When it is necessary to change the flat’s layout or in buildings with heritage protection, we recommend reading this article:

Barcelona licenses and permits

Are you planning a renovation in Barcelona and worried about the bureaucracy?

Processing the building permit is only the first step. To avoid surprises and extra costs, it is ideal to have a
detailed quote from a renovation company
that includes all work items and legal guarantees.

If you are still in the planning phase, we recommend using our
renovation price calculator
to get an instant estimate. You can also consult our
examples of real budgets in Barcelona
to see success stories similar to yours.

Frequently Asked Questions about Licenses

1. Is it mandatory to request a permit to paint or change the flooring?
Yes. In Barcelona, for aesthetic works such as painting, changing flooring, or tiling, you must process the “Assabentat” (Immediate Notification). Although it is a free process and is obtained instantly, it is mandatory for the work to be legal in the event of a possible inspection by the City Police (Guardia Urbana).
 
2. What happens if I perform a renovation without a license?
Carrying out works without the corresponding permit can lead to fines ranging from €300 to €3,000 for minor works. Additionally, the City Council can order the immediate sealing of the works, and you could face issues with your home insurance if an accident were to occur during the renovation.
 
3. How long does it take for the “Assabentat” permit to be approved?
The process is instant. Once you complete the form on the City Council’s Electronic Office and validate the data, the system generates a PDF with the case file number. From that very moment, you have legal permission to start the work.
 
4. Do I need an architect for a minor work notification?
For a standard “Assabentat” (kitchens, bathrooms, floors), it is not necessary to have a technical project or an architect’s signature. However, if the work affects the structure (load-bearing walls), facades, or common elements, then you will need a technician to sign the project.
 
5. How long is the building permit valid for in Barcelona?
Normally, the minor works notification is valid for 3 months to execute the works. If the work takes longer than that, you must request an extension or submit a new notification.

Do This 15-Point Checklist Before Starting Your Bathroom Renovation

A bathroom renovation is an exciting task. But before jumping to choosing the latest tile or bathtub design, there are some less exciting things to consider so your project turns out just the way you dream it. Because renovating a bathroom can be overwhelming, time-consuming and costly, we prepared a simple 15-point checklist to make sure that your project stays on track and the renovation runs smoothly.

1. Budget

If you don’t know already you should work up an idea of how much you want to spend on your bathroom renovation. Setting a budget will help guide you as you make decisions about what to include in the remodel. Once you’ve figured out what you can spend and substracted the amount allocated to labor, you’ll have a clearer sense of what you can spend on tile, fixtures, and extras.

2. Time

Many people assume that if they are remodeling a small bathroom it will only take a few days, or anyway it will take much less time than a larger one. This is not necessarily the case. Depending on how many items you are changing in the bathroom your contractor will have to go through all the same steps as a larger bathroom. However, planning refers not only to defining the duration of the renovation works but also certain intermediate steps such as ordering and purchasing tiles, fixtures, custom-built vanity or cabinets to make sure they can be delivered when your contractor needs them.  Planning time is also crucial for those with only one bathroom in their house as they will have to make arrangements where to take a shower and use the toilet while the bathroom is taken apart.

3. Works sequence

When it comes to bathroom renovation by completing the job in a specific sequence you can save yourself from a lot of clean up time and mistakes. Whether you are demolishing sheetrock or simply repainting, you always want to start at the top of the room. Remodel your ceiling first, walls second, and floors third so you can prevent damage to your new components.

4. Hidden problems

If you are doing a major upgrade to your bathroom consider doing a “full gut”. When done by a professional with expertise you end up with a zero problems bathroom that will function flawlessly and add tremendous value to your home for many years to come. Depending on the age of your home and how well it was built the biggest hidden problem you may encounter is water damage, so look for structural deficiencies in the floor framing, not properly vented plumbing, old corroded plumbing, non-waterproof tile shower/tub surrounds, etc.

 

 

 

 

 

5. Design style and functionality

When first starting out start by thinking about the look you want for your bathroom. There are many factors to consider like paint color, tile choices, vanities, showers, tubs, faucets, etc. It can get overwhelming very quickly so start with some research. You can start to piece together elements that you like into what will become the final design of the bathroom or you may choose a design item you want to feature in the bathroom and then work the rest of the bathroom design around it.

Design should work hand in hand with functionality so consider who will use the bathroom and how, consider an eventual resale of the house and also take a moment to think how the bathroom design will fit in with the rest of the house.

6. Measurements

There are 3 major limitations which really make size matter in bathroom renovation: the overall size of the bathroom (usually the smallest room in the house), the location of existing plumbing pipes and electrical wiring and the typical standard dimensions of bathroom fixtures. Therefore make sure you have the correct measurements and specifications when you go to the store. More frustrating than trying to shop without measurements is to end up purchasing stuff that doesn’t fit.

7. Contractor

Hiring a contract for a conceivably DIY job? Well, yes, that is a smart thing to do given the complexity of the job and difficult operations involved (electrical, tiling, plumbing, etc.). Therefore do not overlook the advantages of hiring a contractor and save yourself a load of misery and time.

8. Plumbing fixtures and features

No renovation is complete without remodeling or repairing fixtures and features, which could very well make a separate checklist themselves: shower, bathtub, toilet, bidet, sink, faucets and shower heads. You should also update or repair your mirrors and shower doors. You can also change the look of your bathroom very easily by changing out door handles, drawer pulls and the hardware for your shower doors. If you have the budget a new set of shower doors can completely change the look of your room.

9. Cabinets, storage and shelving

Planning cabinets, shelving and storing solutions is a tricky problem in most cases. In small, irregular shaped rooms like the bathroom, it is even more so. They need to be functional and accomodate all your stuff while keeping everything easily reachable, they must fit into the available space and make the most of it and on top of it all, they need to look stylish.

 

 

 

 

 

 

 

 

10. Walls and flooring

Virtually any material can be used to surface walls and floors in the bathroom as long as it’s waterproof, either naturally or by means of an impervious finish. Depending on your budget and style, ceramic, marble, and granite tiles make handsome and highly durable flooring and wall surfaces for baths. For flooring additional options may include cement (painted or stained), sheet vinyl or vinyl tiles which are inexpensive and look better than used to. Whatever your choice, always mind another key criteria for choosing your bathroom flooring: durability and slip-resistance.

11. Lighting

A bathroom can be rendered impractical or downright dangerous without adequate lighting so plan for design lighting that is functional and also creates atmosphere. Plan for maximizing natural light first, whereas for artificial light it is adviseable you should have least 4 watts of incandescent lighting per square foot.

12. Accessories

Although apparently insignificant in the bigger picture of the overall project, no remodel is complete without new accessories. And surprisingly enough, the small stuff like new towels, wash clothes, soap dishes, mirrors, towel racks, bath mats do add up to the final bill. If you are on a budget, new hand towels will be better than nothing.

13. Ventilation

Ventilation is crucial in a wet room like the bathroom. It is also a tricky task which needs good planning: choosing the right fan, the right position for its installation and dealing with the electrical wiring. Poor ventilation can leave your bathroom damp, mouldy and can even harm your health. A well-ventilated bathroom, however, isn’t just a healthy bathroom. Continual airflow can also prevent both the decay of any wooden trim or fixtures and the saturation of building insulation.

14. Going green

Even if you personally don’t care about going green one way or the other, the market is trending toward this so it’s something to consider. And there are many budget friendly options for adding a green touch to your bathroom: a low flow toilet that uses less water and saves you money in water bills; low-VOC or no-VOC paints; vanities made from sustainably harvested wood; recycled glass tile surface countertops, etc.

15. Final clean

The final clean should include a thorough cleaning of all cabinetry, inside and out, ductwork, walls, floor, windows, and light fixtures. Although often overlook in the planning phase, in the case of a major renovation you may want to consider contracting a cleaning service which means additional costs that impact your budget. If you feel up to doing it yourself, you may need to add a day or two to your initial timing.

Logotipo de Reformas Barcelona
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.